Project:
|
M1 Business Park
|
Location address:
|
H-2071, Páty, M1 Business Park
|
Project description:
|
Logistics and distribution warehousing light industrial assembly
The M1 Business Park totals some 72,000 m2 of logistics and distribution warehousing built to the latest standards. The five phase development can also accommodate light industrial assembly on request. The current plans are designed to achieve optimum efficiency and clear internal height combined with flexibility. Due to the size of the M1 Business Park, future expansion can be accomodated, as well as build-to-suit solutions for companies seeking individual identity or technical requirements. M1 was constructed and completed in five independent buildings with different layouts and internal traffic systems.
Building A, completed towards the end of 2001 comprises a total leased area of 4 088 m2 warehouses and 618 m2 of office space arranged over two floors.
Building B, has potential area of 22 000 m2 for warehouses and 2 695 m2 for offices. This building is the last development of the park, which was built in 3 phases. Completion of the third (last) phase was in April, 2006.
Building C, completed towards the end of 2001 comprises a total leased existing area of 14 181 m2 warehouses and 1 364 m2 of office space arranged over two floors.
Buiding D, completed towards the end of 2002 comprises a total leased existing area of 5 540 m2 warehouses and 1 800 m2 of office space arranged over two floors.
Building E, was completed by the end of 2003 and comprises of a total leased existing area of 8 080 m2 warehouses and 980 m2 of office space arranged over two floors. Building E has potential area of 6 060 m2 for warehouses and 735 m2 for offices. 139 parking places are available.
The Park represents the future of light industrial, logistics and distribution in Hungary.
|
Total size:
|
70,000 sqm
|
Status:
|
3 phases (Buildings A, C and D) completed and 100% let
4th phase (Building E) is completed and 75% let
Building B completed in Q2 2006
|
Completion Date:
|
3rd phase of Building B: April, 2006
|
Location:
|
Distance to Törökbálint Railway Freight terminal: 5 km Distance to Austrian Border: 160 km Distance to airports: Budapest Ferihegy 40 km, Vienna Schwechat 200 km Bus Services: every 15-30 minutes from Budapest center directly to the park
|
Amenities:
|
11 m clear internal heightFloor load 5 t/m2
|
Services:
|
Built-to-suit solutionsFull-service property management with 24-hour securitySecured parking spaces on siteLandscaped environmentPetrol station adjacentLight industrial use possibility
|
Tenants:
|
DHLEXELKühne & NagelMetál Hungária Holding Rt.ScanfilStora Enso PackagingWilli Betz
|