AIG/LINCOLN projectsheet
BACK TO AIG / LINCOLN HUNGARY / ROMANIA HOME  
MAGYAR NYELVŰ VÁLTOZAT  VERSIUNEA ÎN LIMBA ROMÂNĂ  
print  

Project:

M1 Business Park

Location address:

H-2071, Páty, M1 Business Park

Project description:

Logistics and distribution warehousing light industrial assembly

The M1 Business Park totals some 72,000 m2 of logistics and distribution warehousing built to the latest standards. The five phase development can also accommodate light industrial assembly on request. The current plans are designed to achieve optimum efficiency and clear internal height combined with flexibility. Due to the size of the M1 Business Park, future expansion can be accomodated, as well as build-to-suit solutions for companies seeking individual identity or technical requirements.
M1 was constructed and completed in five independent buildings with different layouts and internal traffic systems.

Building A, completed towards the end of 2001 comprises a total leased area of 4 088 m2 warehouses and 618 m2 of office space arranged over two floors.

Building B, has potential area of 22 000 m2 for warehouses and 2 695 m2 for offices. This building is the last development of the park, which was built in 3 phases. Completion of the third (last) phase was in April, 2006.

Building C, completed towards the end of 2001 comprises a total leased existing area of 14 181 m2 warehouses and 1 364 m2 of office space arranged over two floors.

Buiding D, completed towards the end of 2002 comprises a total leased existing area of 5 540 m2 warehouses and 1 800 m2 of office space arranged over two floors.

Building E, was completed by the end of 2003 and comprises of a total leased existing area of 8 080 m2 warehouses and 980 m2 of office space arranged over two floors. Building E has potential area of 6 060 m2 for warehouses and 735 m2 for offices. 139 parking places are available.

The Park represents the future of light industrial, logistics and distribution in Hungary.

Total size:

70,000 sqm

Status:

  • 3 phases (Buildings A, C and D) completed and 100% let

  • 4th phase (Building E) is completed and 75% let

  • Building B completed in Q2 2006

    Completion Date:

    3rd phase of Building B: April, 2006

    Location:

    Distance to Törökbálint Railway Freight terminal: 5 km
    Distance to Austrian Border: 160 km
    Distance to airports: Budapest Ferihegy 40 km, Vienna Schwechat 200 km
    Bus Services: every 15-30 minutes from Budapest center directly to the park

    Amenities:

  • 11 m clear internal height
  • Floor load 5 t/m2
  • Services:

  • Built-to-suit solutions
  • Full-service property management with 24-hour security
  • Secured parking spaces on site
  • Landscaped environment
  • Petrol station adjacent
  • Light industrial use possibility
  • Tenants:

  • DHL
  • EXEL
  • Kühne & Nagel
  • Metál Hungária Holding Rt.
  • Scanfil
  • Stora Enso Packaging
  • Willi Betz